Overview
The Saijo Factory in Hiuchi, Saijo City, Ehime is one of five front-end wafer fabs operated by Renesas Semiconductor Manufacturing Co., a wholly owned Renesas subsidiary. Built by Mitsubishi Electric, it was completed and began operation in 1984 as a pioneering fully automated fab that became a model for automated DRAM fabs of its era. In Renesas's mid-2020s production restructuring it was singled out, together with Naka and Kawashiri, as a core fab to keep running while other domestic front-end sites faced transfer, downsizing, or closure. Key facility details include: The facility is situated at Ehime, Japan. It focuses on Analog / Power, Mixed-Signal on 200mm wafers. Production at this facility commenced in 1984.
Technology
About Renesas Electronics
Renesas Electronics Corporation delivers trusted embedded design innovation with complete semiconductor solutions that enable billions of connected, intelligent devices to enhance the way people work and live.