Overview
YMTC Wuhan Phase 3 is a 300mm 3D NAND flash fab at the company's site in the East Lake High-tech Development Zone of Wuhan, China. It is run through a joint venture formally established in September 2025 with registered capital of RMB 20.72 billion (nearly US$3 billion), held 50.2% by YMTC and 49.8% by the state-backed Hubei Changsheng Phase III fund. Building on YMTC's wafer-bonding Xtacking architecture, the fab is being brought up on the company's latest Xtacking 4.0-generation (around 270-layer) 3D NAND and is expected to begin mass production in 2026, expanding YMTC's output beyond the existing Phase 1 and Phase 2 fabs toward a targeted capacity of about 100,000 wafers per month. Key facility details include: The facility is situated at East Lake High-tech Development Zone, Wuhan, China. It focuses on NAND, DRAM and 3D NAND (Xtacking 4.0) process nodes on 300mm wafers. This site represents a production capacity of 100,000 wafers per month. Production at this facility is expected to begin in 2026.
YMTC Wuhan ()
* This is a sum of all 4 facility phases (current & planned).
Facility Phases
About YMTC
Yangtze Memory Technologies Co., Ltd. (YMTC) is an IDM semiconductor company focusing on 3D NAND flash memory design and manufacturing. YMTC's Xtacking architecture drives innovation in storage performance and density.