Overview
Intel Fab 42, at the Ocotillo campus in Chandler, Arizona, is a 12-inch (300mm) logic fab that came into high-volume production in 2020 after a roughly US$7 billion buildout. It manufactures processors on the Intel 4 and Intel 3 nodes and, together with Fabs 12, 22, 32, 52 and 62, makes Ocotillo Intel's largest US manufacturing site. Key facility details include: The facility is situated at 4500 S Dobson Rd, Chandler, AZ 85248, USA. It focuses on Logic / Foundry and Intel 3, Intel 4 process nodes on 300mm wafers. This site represents an estimated investment of $7B. Production at this facility commenced in 2020.
Technology
About Intel
Intel is an industry leader, creating world-changing technology that enables global progress. As an Integrated Device Manufacturer (IDM), Intel is expanding its local manufacturing footprint through the Intel Foundry Services (IFS) initiatives.